Touréchaf

Dismantle in the reverse order of assembly... T O U R É C H A F : F A L S E W O R K T O W E R W I T H I N T E G R A L S A F E T Y S Y S T E M 9 NT008 - TOURÉCHAF TECHNICAL INFORMATION Assembling and dismantling a 1.00 x 1.00 m tower... Type of tower Number of frame levels 1 2 3 4 5 Minimum height (1) 1.82 m (2) 2.37 m 3.37 m 4.37 m 5.37 m Maximum height 2.46 m 3.46 m 4.46 m 5.46 m 6.46 m Base jack 4 4 4 4 4 1.00 m ledger 4 4 4 4 4 1.00 m access frame 1 1 1 1 1 1.00 m frame 3 7 11 15 19 2-way adjustable head 4 4 4 4 4 1.00 m access deck 0 1 1 2 2 0.20 x 1.00 m Panacier (steel board) 0 1 1 2 2 0.30 x 1.00 m deck 0/3 0 0 (3) 0 (3) 0 (3) Weight (kg) 130/140 190 230 290 330 2 3 4 5 1 Components required for 1.00 x 1.00 m tower Temporary deck level. (1) - N.B.: add a few cm for falsework striking. (2) - Min. height determined by the length of the 2 screw jacks. (3) - Add 3 additional 0.30 x 1.00 m decks for assembling towers with more than 3 levels. > 3 - Fit three 0.30 m decks and then fit the 2nd level frames. > 2 - From the inside of the tower, fit the 1 st level frames with an access frame. > 1 - Erect the base and level it.Verify the square by pushing a deck into the angle. > 6 - Remove two 0.30 m decks. Go down to the lower level and remove the 3rd panel. > 5 - Fit the 3 rd level frames. > 7 - Fit an access deck then a 0.20 m panacier (steel board). > 8 - The first-level deck can be removed.Access the upper level and fit and adjust the adjustable heads. Dismantle in the reverse order. Raise the deck to its final position so that there is 2.00 m between decks. Fit a temporary deck level > 4 - Fit a 0.30 m deck and climb up to the next level using the built-in ladder. Fit 2 more 0.30-m decks. Three 0.30 x 1.00 m steel decks 1 access deck and 1 0.2 x 1.00 m Panacier Final deck level. REQUIREMENTS: > Ensure that the load is evenly distributed on the ground. > Ensure that the base is levelled. > Fit the first level frames from inside the tower. > Fit the trapdoor next to the ladder. > Ensure that the towers are stable. > Centre the load in the fork heads. > Check that the screw jacks are vertical. > Engage the decks securing pins. TOURÉCHAF Keep hands above the nut

RkJQdWJsaXNoZXIy OTQ2MzM=