T O U R É C H A F : F A L S E W O R K T O W E R W I T H I N T E G R A L S A F E T Y S Y S T E M 10 NT008 - TOURÉCHAF TECHNICAL INFORMATION Dismantle in the reverse order of assembly... Assembling and dismantling a tower with 6 legs... Fit a temporary deck level > 2 - From the inside of the tower, fit the 1st access frame diagonally and swivel to lock it. > 1 - Erect the base and level it.Verify the square by pushing a deck into the angle. > 3 - Assemble the 2 nd level. > 4 - Fit a 2 nd deck level. > 5 - The scaffolding must be braced using ledgers and diagonal braces. > 6 - Move up to the next level and fit the fourth access deck. > 7 - Assemble the frames for the third level. > 8 - Move the first two access decks. Assembling towers with 6 legs: Frame Ledger Diagonal brace REQUIREMENTS: > Ensure that the load is evenly distributed on the ground. > Ensure that the base is levelled. > Fit the first level frames from inside the tower. > Fit the trapdoor opposite the ladder. > Ensure that the towers are stable. > Centre the load in the fork heads. > Check that the screw jacks are vertical. > Engage the decks securing pins. Raise the access decks to their final position so that there is a height of 2.00 m between decks. Fit a temporary deck level WARNING: The middle standards must be braced using ledgers and diagonal braces at all levels.

RkJQdWJsaXNoZXIy OTQ2MzM=