NT008 - TOURÉCHAF TECHNICAL INFORMATION 39 T O U R É C H A F : F A L S E W O R K T O W E R W I T H I N T E G R A L S A F E T Y S Y S T E M > 1 - Install the GCC guardrail to secure the future formwork then the formwork beams. > 2 - Lay the plywood and temporary mesh barriers thanks to post universal supports.Assemble the second part of the falsework. > 3 - Acceptance of the first part of the falsework. Remove the GCC guardrail. > 4 - Install the decking between the first and second part of the falsework. > 5 - If required, install the GCC guardrail at the edge of the second part. Install the formwork beams. Remove the temporary mesh barriers. Install the plywood. Install a temporary guardrail for a partial acceptance of the falsework: Collective protection is also gains in productivity... TOURÉCHAF