Escalib Mills_GB

 48.3 tube 1.20 E S C A L I B M I L L S : S I T E S P I R A L S T A I R T O W E R W I T H S I D E E X I T . 17 > 2 - Swing of the guardrails of the Escalib and remove the peripheral guardrails to allow for circulation. Access onto a roof slab. Gangway over a shear wall. > Crane installation of a front access gangway in collective protection: Safety harness use is not required during the assembly phase. > Examples of gangways for front exit: +/- 17% > 1 - Assemble of the gangway on the ground. Lift and install the MDS Gangway Bracket on the stair string of the Escalib in safety behind the guardrails. Install of the anti-lifting system. Unsling. Guardrails can be disassembled from the Base to save storage space. REQUIREMENTS: > Dismantle in the reverse order of assembly. 160.16 1.50 0.16 Assemble an MDS gangway bracket beforehand on each Escalib before installing the Front access gangway equipped with a Start at each end. The gangway is centred with respect to the Escalib Mills. 1.10 0.16 1.50 0.21 0.25 > MDS GANGWAY BRACKET Description Code Weight M DS gangway bracket 013272-0 29.6 *Mini M DS Gangway Bracket 014124-2 23.6 1.00 2 M12-100-8.8 bolts 1.20 or 1.60 * Intended for Mini Escalib. Anti-lifting system not supplied. 4 M18-40-8.8 bolts 2 M8-20-8.8 bolts > GANGWAY STARTV2 Description Code Weight Gangway start V2 013416-3 40.5 Guardrail Base > FRONTACCESS GANGWAY ASSEMBLYWITH BOLTS Description Code Weight Front access gangway assembly with bolts 013441-1 197.5 4 M12-60-8.8 TFHC (bolt inside) 4 M18-40-8.8 bolts 1.10 1.50 1.35 > GANGWAYARRIVAL Description Code Weight Gangway arrival 013419-7 23.4 ESCALIB MILLS NT 010 - ESCALIB MILLS TECHNICAL INFORMATION

RkJQdWJsaXNoZXIy OTQ2MzM=