Aims and challenges for customer
Bouygues Construction Habitat Social realizes the residence of hillsides a set of 14 buildings in R+2 to Vitry-sur-Seine (94). Even before the construction site starts, a scaffold must be installed in suburb of the constructions.
Solutions applied
The agency of Mills Paris studied and installed 190 T of Mills Acram equipped with guardrail MDS. For every building a staircase of access is installed with a recipe with materials.
|
Document |
|
|
|
|
Result
The collective protection authorizes the traffic and the work of all the building trades which intervene in the progress of the construction site since the mason, the glazier, the electrician or still the joiner which use the scaffold of the access and the zones of storages.
|
|
 |
Realization : Paris Customer : Bouygues Construction Habitat Social Weight : 190 T Mills Acram MDS Realization : 2010 |
 |
|